This project included tearing down an existing 3 story High School and building a new single story High School on the existing site. The previous kitchen was renovated and the old gymnasium was kept and is currently used as a practice gym. The new school added a Home Economics room, two computer labs, a music room, two science labs, a shop class and lab, and an event gym that seats 1,100 people.
Sq Ft: 45,900 $6,000,000