The existing 65 year old wood gymnasium floor buckled in the center and became a hazard to students. The existing floor was removed while the existing bleachers remained intact. The existing floor joists were all reinforced and leveled. A grade 3 maple floor on a scissor loc system was installed with an under floor blower system. The maple was custom stained and painted with the school’s graphics.